Ashbridges Bay Wastewater Treatment Plant –
Our expert engineers provided innovative solutions for the partial demolition of the Waste Heat Recovery (WHR) and Incinerator Buildings within an active plant. This complex project required a carefully engineered demolition plan to ensure a safe structural separation from the portions of the building that were to remain, while preserving the structural integrity of the surrounding facilities. Our team developed detailed plans and procedures for the contractor, including a precise demolition sequence, hoisting and rigging details for large steel beams, equipment loading guidelines for the floors, and a protection plan for the existing slab on piles, which will serve as the foundation for
future construction.
CLIENT NAME
York1 Demolition
PROJECT LENGTH
2023-Spring 2025
PROJECT CATEGORY
Demolition
The Challenge
Conduct the partial demolition of the WHR and Incinerator building while the plant remained active.
The Solution
A thorough engineered demolition plan, including hoisting and rigging details for large steel beams, equipment loading guidelines for the floors, and a protection plan for the existing slab on piles, which will serve as the foundation for
future construction.