Engineering Constructs designed major structural modifications, preserving portions of the existing exterior masonry walls and roof structure. To ensure stability during selective demolition, a versatile system was designed that functioned as both temporary bracing and part of the permanent structure, streamlining the process for safe, efficient construction. By collaborating closely with the contractor, a design was created to optimize for ease of construction, exemplifying our commitment to precision, adaptability, and project success.
CLIENT NAME
Private Owner
PROJECT LENGTH
2023-Ongoing
(estimated completion, Winter 2025)
PROJECT CATEGORY
Residential & Temporary Works
The Challenge
Partial demolition of the home to allow for the new construction.
The Solution
Use both temporary and permanent bracing to stabilize the structure throughout the partial demolition.