Engineering Construct’s expertise in bridge engineering was key to executing a safe and efficient demolition plan for a structurally deteriorated 5-span cast-in-place concrete box girder bridge. A comprehensive engineered plan was prepared, backed by a thorough structural analysis, to ensure the stability and safety of the bridge during demolition. To maintain strength and prevent structural failure as the deck and girders were removed, temporary supports were designed and strategically reinforced the unique rocker bearings. Our experienced team’s meticulous planning enabled a smooth, secure demolition, laying the groundwork for the bridge’s replacement and future functionality.

CLIENT NAME

Fundy Contractors

PROJECT LENGTH

2024-2025

(estimated completion, Spring 2025)

PROJECT CATEGORY

Demolition

The Challenge

Safely demolish a deteriorated bridge.

The Solution

After a thorough structural analysis, temporary supports were put in place so workers could safely demolish the bridge

Services Provided

Bridge Demolition Engineering

Engineered Demolition Plan

Temporary Shoring

Temporary Bracing

Structural Assessment